China Heavy Duty Truck Manufactuer
Truck Operation

Categories

Latest Blog

Tags

New Products

  • wrecker towing truck

    HOWO 50 ton heavy duty wrecker towing truck

    This wrecker has the functions of lifting, pulling, lifting, etc. It is convenient, quick, good-looking, safe and reliable. This truck wrecker is widely used in highways, public security traffic police, airports, terminals, auto repair industry and highway companies, etc.

  • heavy duty separated tow truck

    HOWO 40 ton boom and underlift separated tow truck

    Wrecker truck equipped with lifting winch device and wheel bracket which can lift, towing, back load and transport.Widely used in road, police traffic, airports, docks, auto repair company, industry and highway departments, timely, fast clean-up accident, failure, illegal and other vehicles.

  • heavy duty ratotor towing truck

    Howo 30 ton heavy duty ratotor towing truck

    Road wrecker is used for safety salvage of vehicles subject to city road, suburb way, highway, airport and bridge road. It is suitable for medium and small-sized cargos, cars and other special vehicles, which are allowed within the technical parameters of this kind

  • heavy duty integrated tow truck

    25 ton howo heavy duty integrated line of wrecker ​recovery truck

    The tow wrecker is called the road wrecker, also known as road rescue vehicle. It has many functions such as lifting, pulling and lifting traction. 

  • stage boom breakdown truck

    25 ton howo heavy duty with stage boom breakdown truck

    The INT series is out integrated line of tow trucks commonly called wreckers. We have a wide range of products with 6 different models ranging for the small 3 ton to the massive 60 ton with a 3 stage boom. 

Operation Tips of Chips Synchronous Sealer Truck

2021-02-20

1) Before operation, check the various parts of the truck: valves, nozzles and other working devices of the piping system, and they can be used normally if there is no fault.

Synchronous chipsealer

2) After checking that there is no malfunction of the synchronous sealing truck, drive the truck under the filling pipe, first put all the valves in the closed position, open the small refueling cap on the top of the tank, put the refueling pipe in to start bitumen filling, and the refueling is complete Close the small fuel cap tightly. The pitch to be filled must meet the temperature requirements and cannot be filled too full.

Synchronous chip sealer truck

3) After the synchronous sealing truck is filled with asphalt and gravel, start slowly and drive to the construction site at a medium speed. During transportation, no people are allowed to stand on each platform, and the power take-off must be disengaged. Burners are prohibited during driving. Turn off all valve.

Synchronous sealer truck

4) After being transported to the construction site, the temperature of the asphalt in the tank of the synchronous sealing truck cannot meet the spraying requirements. The asphalt must be heated, and the asphalt pump can be rotated during the asphalt heating process to achieve a uniform temperature rise.

Chips Synchronous Sealer Truck

5) After the asphalt in the tank meets the spraying requirements, drive the synchronous sealing truck until the spray pipe is about 1.5-2m away from the starting point of the operation and stop. According to the construction requirements, you can choose the front-end control automatic spraying and the back-end control manual spraying operation. It is forbidden for the people on the middle platform to keep driving at a constant speed, and it is forbidden to step on the accelerator.

Chips Synchronous Sealer Truck

6) Filters, asphalt pumps, pipes and nozzles must be cleaned when the work is completed or the construction site is changed halfway.

synchronous sealing truck

7) After cleaning the last vehicle every day, the vehicle must be collected after the operation.

synchronous sealing truck

8) The remaining asphalt in the tank must be cleaned.


    ①Open the asphalt cover, take the filter out and put it in the diesel to clean it.

    ②Check all asphalt valves and air valves, and they must all be closed.

    ③Close the main air supply valve, and turn off the front and rear console power switches.

    ④Close the left and right rear nozzles and make sure the hooks are hung firmly.

    ⑤Clean up the remaining stone chips in other places such as the stone gate, spreading roller, etc.

    ⑥Gather the stone divider and lower slide, lift the lower slide to the high position and fix it.


SEND A MESSAGE

CLVEHICLES is one of the experienced truck manufacturer, export various special trucks, accept custom srevice, welcome to visit our factory and showroom to know more about us.
partner
partner
partner
partner
partner
partner
partner
partner
partner
partner
 
Got Free Inquiry Now Please click here for inquiry
If you have questions or suggestions, please leave us a message,we will reply you as soon as we can!